Analisis Optimalisasi Waktu dan Biaya Menggunakan Precedence Diagram Method (PDM) dan Metode Crashing pada Proyek Pembangunan Bendungan Karangnongko Paket 2 (Studi Kasus: Pekerjaan Intake Kanan)
DOI:
https://doi.org/10.53863/teksling.v5i01.2153Keywords:
Precedence Diagram Method, crashing, critical path, project durationAbstract
Construction project delays frequently occur due to conventional scheduling methods that are ineffective in managing activity interdependencies, leading to cost overruns and reduced project performance. Previous studies generally focus on basic scheduling techniques without simultaneously addressing time and cost optimization, while the integrated application of the Precedence Diagram Method (PDM) and the crashing method remains limited. This study aims to analyze project duration acceleration using PDM and crashing through a descriptive quantitative approach, including network development, critical path identification, and crashing of critical activities. The results indicate a project duration reduction of 54 days with an increase in direct costs of IDR 2,466,904,057.21, resulting in a cost difference of IDR 2,115,700,868.75 between normal and crashing conditions. These findings confirm that PDM and crashing are effective project control strategies based on time–cost trade-offs.
References
Agnes A.A., T. T. (2024). Optimalisasi Waktu Pelaksanaan Dengan Metode PDM Pada Proyek Pembangunan Puskesmas Bailang Tuminting. TEKNO, 22(87), 50 - 58.
Amalia, R. (2025). Analisis Percepatan Waktu (Crashing) Menggunakan Metode Time Cost Trade Off Pada Proyek Rehabilitasi Daerah Irigasi Siman Mojoagung Jombang. Jurnal Multidisiplin Ilmu Akademik, 2(5), 384 - 389.
Mahaptani. (2019). Metode Perencanaan Dan Pengendalian Proyek Konstruksi.
Naufal, Z. S. (2025). Optimasi Waktu Dan Biaya Dengan Menggunakan Metode PDM (Precedence Diagram Method) Pada Proyek Pembangunan Kawasan PKL Ketandan (Ketandan Utama), Yogyakarta. 130 - 138.
Nurhidayat, A. A. (2021). Optimalisasi Pembangunan Proyek Apartemen SGC Cibubur Dengan Menggunakan Metode Presedence Diagram Method (PDM). Jurnal Teknik Industri, 10(1), 22 - 32.
Prakoso, D. A. (2023). Analisis Network Planning Pada Proyek Apartement Savyavasa Di Jakarta Selatan Dengan Metode Program Evaluation Review And Tecnique (PERT). Jurnal Riset Ilmiah, 2(10), 4156 _ 4168.
Pratama, P. I. (2023). Penjadwalan Ulang Dengan Precedence Diagram Method (PDM) Pada Proyek Konstruksi Gedung Penunjang Pembelajaran Universitas Negeri Malang. Studen Journal GELAGAR, 1 - 10.
Rani, H. A. (2016). Manajemen Proyek Konstruksi.
Sinaulan, M. J. (2023). Optimalisasi Waktu Pembangunan Ruas Jalan Dengan Metode PDM (Precedence Diagram Method) Pada Proyek Pembangunan Ruas Jalan Mantehage Buhias Minahasa Utara. 21(85), 1212 - 1218.
Sutrisno, W. T. (2023). Analisis Percepatan Waktu dan Biaya pada Proyek Pembangunan Gedung Sekolah Dasar Wachid Hasyim Kota Surabaya Menggunakan Metode Crashing. Jurnal Teknik Sipil, 16(1), 123 - 130.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Aisyah Nur Sholekah, Agung Sutarto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.